Super B provides a single 230,000 sq ft warehousing and prime logistics unit situated on a 10.4 acre site at Interchange 26 in Cleckheaton, Kirklees, Bradford, in West Yorkshire. The site forms part of Opus North’s new manufacturing and logistic park, branded Interchange 26. Super B reached completion in Q3 2022 and has since been let by developer Tungsten Properties to the tenant.
The unit delivers warehousing facilities featuring a clear 15-metre haunch alongside two storeys of CAT A offices. External parking and servicing facilities further enhance the operational efficiency of the development.
The scheme proudly delivers the ESG credentials of BREEAM Very Good and stands as a Net Zero Carbon development.
![51191-23-scaled-aspect-ratio-1400-550](https://htcarchitects.co.uk/wp-content/uploads/2023/11/51191-23-scaled-aspect-ratio-1400-550-scaled.jpg)
- Location: Bradford, West Yorkshire
- Client: Tungsten Properties
- Contractor: Winvic Construction
- Engineer: PRP Consulting
- Highways: ADC Infrastructure
![51191-24-scaled-aspect-ratio-820-729](https://htcarchitects.co.uk/wp-content/uploads/2023/11/51191-24-scaled-aspect-ratio-820-729-scaled.jpg)
![51191-27-scaled-aspect-ratio-600-427](https://htcarchitects.co.uk/wp-content/uploads/2023/11/51191-27-scaled-aspect-ratio-600-427-scaled.jpg)